Sample Projects
Selected projects from our portfolio — covering road networks, airport pavements, county roads, and parking facilities across the United States.
IIHUB conducted a full ASTM D6433 PCI survey of the municipal road network for the City of Hamlin, Texas. The project required efficient mobilization and rapid data collection to minimize impact on city operations.
Every road segment was documented with geotagged imagery, distress identification per ASTM methodology, and PCI scoring. The city engineer received a complete GIS-ready deliverable package with condition maps, a prioritized maintenance list, and preliminary cost estimates for recommended treatments.
The City of Goldendale, Washington engaged IIHUB to conduct a PASER-based pavement condition survey of all city-maintained road segments. PASER was selected as the appropriate methodology for network-level screening of a city of this size and budget.
Each road segment received a PASER rating (1–10), geotagged photographic documentation of representative distresses, and a prioritized list of segments recommended for immediate action, preventive maintenance, or monitoring. GIS outputs were delivered in Google Earth and shapefile formats.
IIHUB conducted a comprehensive ASTM PCI pavement condition assessment for an industrial facility in California. The project required efficient mobilization, coordinated access with site operations, and high-resolution drone-based data collection.
Deliverables included section-level PCI ratings, geo-referenced orthomosaic imagery, distress overlay maps, GIS-ready shapefiles, and a prioritized repair schedule with cost estimates by treatment type to support the facility's capital planning cycle.
A commercial parking facility in O'Fallon, Missouri engaged IIHUB for a comprehensive pavement condition assessment. The owner needed objective condition data, repair cost estimates, and a phased maintenance plan to support capital budget planning.
IIHUB delivered an ASTM PCI report with section-level ratings, drone-generated orthomosaic imagery with distress overlays, CAD and GIS-formatted deliverables, a visual evaluation of existing striping and marking conditions, repair quantity estimates by treatment type, and a 3-year phased maintenance budget.
Every project starts with a conversation. Tell us what you have, and we'll help you scope the right approach.